At the Early Education Institution (IET) No. 8, a series of important repair and modernization works have been carried out. These include the repair of five sanitary blocks and the medical office, thus improving hygiene and safety conditions for both children and staff.
Additionally, partial window replacement was undertaken, contributing to improved energy efficiency and interior comfort.
A new pavilion for outdoor activities was constructed, providing additional space for play and recreation.
Two galleries within the institution were completely renovated, enhancing both functionality and aesthetic appeal.
Moreover, the lighting system was partially renewed, ensuring better visibility and safety inside the building.
At the same time, the roof of Block A was replaced, thereby protecting the institution's structure from potential leaks and damage.