Constantin Stere Street and part of Vasile Lupu Street in Buiucani sector rehabilitated. The street had never undergone capital repair since its construction.
The rehabilitation was carried out from Alexei Șciusev Street – Dinamo Stadium up to Eugen Coca Street and included:
- Milling of the old asphalt
- Raising manhole covers to road level
- Replacement of curbs
- Repair of the sidewalk on the even-numbered side (rehabilitation of the sidewalk on the odd-numbered side had already been completed).