Centru / Infrastructure / Roads and pavements

Repair of Nicolae Testemiteanu Street

Repair of Nicolae Testemiteanu Street Repair of Nicolae Testemiteanu Street Repair of Nicolae Testemiteanu Street Repair of Nicolae Testemiteanu Street Repair of Nicolae Testemiteanu Street Repair of Nicolae Testemiteanu Street Repair of Nicolae Testemiteanu Street

Description

Nicolae Testimiteanu Street was repaired in spring 2020.

Initially, sidewalks were repaired, in complex with those on Ion Inculet Street, with a total pedestrian area of 8.4 thousand m2.

Subsequently, the roadway was completely rehabilitated, on a total area of 21 thousand m2.

The total cost of the works was 12.6 million lei.

Investment: 12 628 600 lei
Read more

Project made jointly with the city residents!