Nicolae Testimiteanu Street was repaired in spring 2020.
Initially, sidewalks were repaired, in complex with those on Ion Inculet Street, with a total pedestrian area of 8.4 thousand m2.
Subsequently, the roadway was completely rehabilitated, on a total area of 21 thousand m2.
The total cost of the works was 12.6 million lei.
Investment: 12 628 600 lei