The Ivan Zaikin Stable has undergone an extensive rehabilitation process and will be refurbished in 2022 with the support of the Jewish Community of Chisinau.
The repair works included:
- the
construction of a protective dam against unevenness;
- the installation of
pedestrian walkways, including an access path for people with reduced
mobility;
- the rehabilitation of the green space;
- the installation of street
lighting;
- the installation of an irrigation system;
- the installation of a
children's playground and street furniture;
- the installation of a video
surveillance system.
150 trees were planted in the same square as part of a greening campaign.
The value of the work exceeded 3 million lei.
Investment: 3 000 000 lei