The square located at the intersection of Nicolae Zelinski Street and Decebal Boulevard was rehabilitated by the Chișinău City Hall during the period 2022–2024. Previously, the area was in a deplorable condition.
The project included a series of works: repair of access stairs and pedestrian alleys; modernization of public lighting; installation of new urban furniture. A new public transport waiting station was also installed on Decebal Boulevard.
In addition, tactile paving was installed within the square, and an access ramp for persons with reduced mobility was created. The green space was landscaped with trees and shrubs, and for the comfort of visitors, a swing set was also installed.
Investment: 7 542 000 lei