The project to upgrade and renovate the school walkway on Mihail Sadoveanu Street is designed to provide a comfortable and safe space for children and all local residents.
Within the project, the following works have been carried out:
The total budget allocated for this project is 1.260.483
lei.
Investment: 1 260 483 lei