The works to improve and renovate
the pedestrian walkway for schoolchildren in the residential district of
Ciocana added value to the area.
The project included the following works:
-
landscaping of the pedestrian path;
- landscaping of green areas with fertile
soil;
- installation of a playground;
- installation of a fitness court;
- repair
of the retaining wall around the perimeter of the fitness machines;
-
rehabilitation of the storm drainage system;
- construction of a decorative wall
(gabion) to protect the green areas from erosion.
The budget allocated for the
project was 3 008 116 lei.