Sidewalk, Mircea cel Batran (top part)

Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part) Sidewalk, Mircea cel Batran (top part)

Description

In the Ciocana sector, the project to rehabilitate and develop the area adjacent to the Mircea cel Bătrân Boulevard alley, in the section between Alecu Russo Street and Prof. Ion Dumeniuc Street, upper part, is continuing.

Within the project, the following works were carried out:

- Installation of curbs;
- Paving of the sidewalk with high quality paving stones;
- 76 parking spaces;
- 2 playgrounds;
- Fitness court;
- Landscaping of green spaces with fertile soil;

The project started in 2022 and is expected to be completed in 2024.

The total budget allocated for this project is 9 253 243 lei.

Investment: 9 253 243 lei
Read more

Project made jointly with the city residents!