The rehabilitation of the hospital building is part of the project "Eficienta Energetica si izolarea termica a institutiilor publice din municipiul Chisinau", launched in 2022.
The works planned under the project include:
- strengthening the building
structure;
- replacing windows and doors;
- rehabilitating the indoor heating
networks;
- rehabilitating the electrical network and ventilation system;
-
installing photovoltaic panels for hot water production;
- repairing the lifts;
- applying state-of-the-art green energy technologies to reduce harmful
emissions.
The cost of the work is estimated at 53 300 000 lei.
The project is
financed by the European Bank for Reconstruction and Development (BERD), the
European Investment Bank (BEI) and the E5P Energy Fund.
Investment: 53 300 000 lei