The capital repair works included the dismantling of old elements of the food block and their replacement with new materials and equipment.
The works carried out under the project:
- repairing the walls;
- renovating the ceiling;
- replacing the flooring.
The carpentry works included the replacement of doors and windows with new elements, thus ensuring adequate thermal and sound insulation.
The budget allocated to this project is 400 000 lei.
Investment: 400 000 lei