During the period 2020-2022, several repair works were carried out in Kindergarten 26.
At the same time, in 2021, a group was reopened in the institution.
The spectrum of works included:
- repair of the heating system;
- rehabilitation of the engineering
networks;
- repair of the sanitary block;
- repair of the walls and floors;
-
repair of the methodical cabinet and the cordor;
- repair of the roof;
-
construction of a pavilion;
- repair of the pavilions.
The total investment for
the repair works amounted to 1.6 million lei.
Investment: 1 652 400 lei