In 2022, 27 Martie 1918 street was completely repaired to increase its capacity to take a good part of the traffic in the sector, unloading Ion Creanga street.
The road surface was completely replaced and areas of the road with defective foundations were rehabilitated, new borders were installed and the storm sewers were repaired. At the same time, work was also carried out on upgrading street lighting, with the installation of pylons and overhead lines and the installation of new energy-efficient lighting fixtures.
Some 6.9 million lei were allocated from
the municipal budget for these works.
Investment: 6 887 000 lei