In 2020, the road was repaired on Bucuriei Street, and after more than 20 years, traffic was resumed on the street, in the perimeter of Ion Creanga Street and Henri Coanda Street.
The following works were carried out:
- replacement of borders;
- milling of the road
surface;
- application of asphalt layers;
- repair of storm sewers.
More than 1
million lei were allocated for these works.
Investment: 1 142 400 lei