Another street in the Botanica sector was repaired in 2022. This is Sarmizegetusa Street, the segment of road between Decebal and Cuza Voda Streets.
The following works were carried out:
- complete milling of the old asphalt surface;
- repair and optimization of the rainwater collection network by installing two open catch basins;
- laying of the new asphalt surface;
- application of road markings.
Previously, the pavements were also repaired here.
The road surface to be repaired is 16.5 thousand m2 and the
estimated cost of the works is 15.5 million lei.
Investment: 15 582 000 lei