8 creative centers in Chisinau have become more child-friendly after the Chisinau City Hall allocated over 4 million lei for capital repair works.
For the repair works of the Technical Creation Centre, 103 Suceava Street, 300 thousand lei were allocated. For the repair of the Technical Creation Centre for Children and Adolescents "Politehnic", bd. I. Gagarin, 4, were allocated 200 thousand lei.
For the repair of the Children's Creative Centre "Ghiocel", M. cel Batran Street 7, 400 thousand lei were allocated. 200 thousand lei were allocated for the repair works of 2 institutions: the " Curcubeul" after-school activity centre, 5 Branistii street and the Children and Youth Technical Creation Centre, 7 Crangului street. For 3 institutions under the General Directorate for Education, Youth and Sport, 1 million 700 thousand lei was allocated.
At the City Centre of Young Naturalists and the Municipal Training Centre for Children and Adolescents with Special Educational Needs, 55 Cetatea Alba Street, the works were successfully completed.
For the capital repair of the 8 creative centers and institutions
with methodical activity in the capital, financial means in the amount of 4 600
000 lei were allocated.
Investment: 4 600 000 lei